In Monolith Construction from Laminated Plywood, The Formwork Is Made and Poured with Concrete, and AFTER ABOVE, Columns, TunNels, Walls and Buildings are Built On Top Top Top.
In Monolith Construction from Laminated Plywood, The Formwork Is Made and Poured with Concrete, and AFTER ABOVE, Columns, TunNels, Walls and Buildings are Built On Top Top Top.
Валюты | Ставка | Изменение % |
---|---|---|
USD | 0,96 | 0,00% |
GBP | 1,20 | 0,00% |
CNY | 0,13 | 0,00% |
JPY | 6,13 за 1 000 | 0,00% |
THB | 0,03 | –0,24% |
CAD | 0,67 | +0,12% |
GBP | 1,20 | 0,00% |
KRW | 662,86 за 1 000 000 | 0,00% |
SGD | 0,71 | 0,00% |
COP | 219,92 за 1 000 000 | 0,00% |
INR | 0,01 | 0,00% |
NOK | 0,08 | 0,00% |
BRL | 0,16 | 0,00% |
BTC | 91 377,31 | –1,88% |
ETH | 3 165,15 | –0,86% |
DOGE | 0,30 | –2,98% |
Курсы валют в EUR на 22.12.2024
Оставить ответ
Смотреть комментарии