The parking area

After the base is made, we proceed to the manufacture of formwork. We make it from the boards that rely on the stakes. Next, pour the first layer of concrete, after which we use a reinforced mesh. When leaving the second concrete layer, you need to make a small slope to flow water. However, if you plan to install the visor on the parking lot in the future, then you need to make the surface even. The manufacture of the parking area is completed on this. You need to wait a few weeks so that all layers are completely dried up.