Allow the

If damaged brickwork was found under the knocked out plaster layer, it is necessary to strengthen it with a metal screed. Increasing the clutch of plaster with the treated surface will allow the application of a mixture of large sand, glue and cement. This surface becomes rough and plaster picked up well to it.