All work must be performed with an eye on the fact that there is still an installation of a stretch fabric ahead.
The third stage is electrical work. The cable is laid to the place of installation of each element.
All work must be performed with an eye on the fact that there is still an installation of a stretch fabric ahead.
The third stage is electrical work. The cable is laid to the place of installation of each element.
Валюты | Ставка | Изменение % |
---|---|---|
USD | 0,93 | +0,05% |
GBP | 1,21 | +0,05% |
CNY | 0,13 | +0,05% |
JPY | 6,11 за 1 000 | +0,07% |
THB | 0,03 | –0,04% |
CAD | 0,67 | +0,02% |
GBP | 1,21 | +0,05% |
KRW | 667,26 за 1 000 000 | +0,05% |
SGD | 0,70 | +0,05% |
COP | 215,56 за 1 000 000 | +0,05% |
INR | 0,01 | +0,05% |
NOK | 0,08 | +0,04% |
BRL | 0,16 | +0,05% |
BTC | 71 281,59 | +0,01% |
ETH | 2 839,60 | +2,75% |
DOGE | 0,19 | +0,20% |
Курсы валют в EUR на 09.11.2024
Оставить ответ
Смотреть комментарии