Preparatory Work Consist of

The WaterProoproofing Device Includes Preparatory and Main Work. Preparatory Work Consist of the Preparation of ISOLATED SURFACES, The PREPARATION OF COLD and HOT Mastics, Solutions, In Turn, The Min Consist of Applying An InSt or it, A Device of A Protective Layer.