2. As the basis for the construction on the prepared foundation, a hard overlap from a non -crossed beam is laid. Lags for the floor with a step of 70 cm are formed from the same timber. On the bars attached to the lags, the black layer for the floor lays down. Then all subsequent layers are placed, of which the design of the floor of the bath consists: peramin, thermal insulation, dodged strict boards.
Оставить ответ
Смотреть комментарии