4. The ceiling is formed by laying on the load -bearing walls around the perimeter of the bath of beams and bars with a step of 70 cm. Below the beams are sheathed with lining, and hydraulic — and thermal insulation is laid on top.
4. The ceiling is formed by laying on the load -bearing walls around the perimeter of the bath of beams and bars with a step of 70 cm. Below the beams are sheathed with lining, and hydraulic — and thermal insulation is laid on top.
Валюты | Ставка | Изменение % |
---|---|---|
USD | 0,90 | +0,07% |
GBP | 1,19 | –0,03% |
CNY | 0,13 | +0,07% |
JPY | 6,30 за 1 000 | –0,34% |
THB | 0,03 | 0,00% |
CAD | 0,66 | +0,03% |
GBP | 1,19 | –0,03% |
KRW | 679,57 за 1 000 000 | +0,01% |
SGD | 0,69 | –0,06% |
COP | 213,47 за 1 000 000 | 0,00% |
INR | 0,01 | +0,07% |
NOK | 0,08 | +0,02% |
BRL | 0,16 | +0,07% |
BTC | 55 558,53 | +1,78% |
ETH | 2 136,29 | +1,51% |
DOGE | 0,09 | +1,52% |
Курсы валют в EUR на 19.09.2024
Оставить ответ
Смотреть комментарии