As for consumables

Tools

For installation, you will need:

Bulgarian.

Perforator (drill).

Roulette (ruler).

Level.

Saw.

Hammer.

As for consumables, you need to prepare wooden planks, mounting foams, metal rods or anchors in advance (their diameter should be approximately ten to twelve millimeters).