It to play the

After everything is correctly marked, you can proceed to the fastening and installation of the profile. Ideally, if the distance between the mounts is about 25 centimeters. Then drywall will fit well to the surface of the wall or ceiling, which will allow it to play the role of a high -quality partition. The last step is decorating a new wall.