The second step is marking. In order to carry out this process, it is necessary to make appropriate measurements both in the room and in the drywall itself, and make tags on the ceiling, walls and material. Do not forget that the installation of the partitions should start from the lower corner of the room.
Оставить ответ
Смотреть комментарии