And a

Remember: the stand is considered ready when the tip, a spoon is fixed on it and a cap, washer is installed.

Install the first two racks

For this, a mortgage part is used, which is standardly used in laying water — or gas pipelines. It has a wall thickness of approximately 3.2 mm and inner diameter 25 mm.