and inorganic pollution.
With the construction of a well with your own hands, it is necessary
take security measures and, with loose or unstable soil, use the spacer when digging.
and inorganic pollution.
With the construction of a well with your own hands, it is necessary
take security measures and, with loose or unstable soil, use the spacer when digging.
| Валюты | Ставка | Изменение % |
|---|---|---|
| 0,84 | 0,00% | |
| 1,16 | 0,00% | |
| 0,12 | 0,00% | |
| 5,45 за 1 000 | 0,00% | |
| 0,03 | 0,00% | |
| 0,62 | 0,00% | |
| 1,16 | 0,00% | |
| 581,49 за 1 000 000 | 0,00% | |
| 0,66 | 0,00% | |
| 229,88 за 1 000 000 | 0,00% | |
| 9,20 за 1 000 | 0,00% | |
| 0,09 | 0,00% | |
| 0,16 | 0,00% | |
| 66 031,54 | +0,47% | |
| 2 031,47 | –0,03% | |
| 0,09 | +3,72% |
Курсы валют в EUR на 01.02.2026
Оставить ответ
Смотреть комментарии