The next expense item is the organization of construction work. This includes the preparation of the site, ensuring work with water and electricity, exporting construction waste and preparing a place for equipment, garages, etc. p.
The next expense item is the organization of construction work. This includes the preparation of the site, ensuring work with water and electricity, exporting construction waste and preparing a place for equipment, garages, etc. p.
Валюты | Ставка | Изменение % |
---|---|---|
USD | 0,96 | 0,00% |
GBP | 1,20 | 0,00% |
CNY | 0,13 | 0,00% |
JPY | 6,13 за 1 000 | 0,00% |
THB | 0,03 | 0,00% |
CAD | 0,67 | +0,12% |
GBP | 1,20 | 0,00% |
KRW | 662,86 за 1 000 000 | 0,00% |
SGD | 0,71 | 0,00% |
COP | 219,92 за 1 000 000 | 0,00% |
INR | 0,01 | 0,00% |
NOK | 0,08 | 0,00% |
BRL | 0,16 | 0,00% |
BTC | 91 400,41 | –1,86% |
ETH | 3 143,01 | –1,57% |
DOGE | 0,30 | –4,00% |
Курсы валют в EUR на 22.12.2024
Оставить ответ
Смотреть комментарии