After that, you can start inspection of the ventilation ducts and the drainage system. Based on the audit, the required number of building materials and the approximate cost of repair work are calculated.
After that, you can start inspection of the ventilation ducts and the drainage system. Based on the audit, the required number of building materials and the approximate cost of repair work are calculated.
Валюты | Ставка | Изменение % |
---|---|---|
USD | 0,91 | +0,04% |
GBP | 1,19 | +0,06% |
CNY | 0,13 | 0,00% |
JPY | 6,19 за 1 000 | +0,25% |
THB | 0,03 | –0,10% |
CAD | 0,67 | +0,06% |
GBP | 1,19 | +0,06% |
KRW | 679,89 за 1 000 000 | +0,03% |
SGD | 0,70 | +0,07% |
COP | 216,37 за 1 000 000 | 0,00% |
INR | 0,01 | +0,08% |
NOK | 0,09 | +0,03% |
BRL | 0,17 | +0,04% |
BTC | 55 519,35 | +0,62% |
ETH | 2 155,61 | +1,13% |
DOGE | 0,10 | +1,48% |
Курсы валют в EUR на 4.10.2024
Оставить ответ
Смотреть комментарии