Wood is subject to drying, so the construction time is reduced, since the constructed design does not require shrinkage. Sometimes the details are produced by entire blocks, in this case, the construction periods are further reduced. First there is an erection of the foundation and log house, then installation of the rafters, crate. After the work, it is necessary for some time to shrink.