For a long

Before laying the final floor (for example, a parquet board or laminate), the base should be strengthened using a high -quality crate.

You need to lay the slabs as close as possible to each other. The floor screed on this material must be left for a long time (until maximum setting) and only then start the arrangement of the final sex. This guarantees excellent quality and durability of the entire structure.