Groove, a

Installation of panels

The lower edge of the first siding is attached into the base strip below, and the upper edge is nailed to the crate. Between the angle and the material it is necessary to leave a gap of up to 6 mm to compress and expand the panel. The second row followed the first. The panels are connected to the lower cladding elements. If the panel sits in a groove, a characteristic sound of snaping will be heard. This is how the rest of the rows are installed.