4. The final stage of the installation of the bath with your own hands is to connect the siphon to sewage, checking the stability of the bath, the tightness of the rubber seal. Then the gap between the edge of the bath and the wall is sealed.
4. The final stage of the installation of the bath with your own hands is to connect the siphon to sewage, checking the stability of the bath, the tightness of the rubber seal. Then the gap between the edge of the bath and the wall is sealed.
Валюты | Ставка | Изменение % |
---|---|---|
USD | 0,92 | 0,00% |
GBP | 1,19 | –0,05% |
CNY | 0,13 | 0,00% |
JPY | 6,01 за 1 000 | +0,05% |
THB | 0,03 | +0,18% |
CAD | 0,66 | 0,00% |
GBP | 1,19 | –0,05% |
KRW | 666,45 за 1 000 000 | 0,00% |
SGD | 0,69 | 0,00% |
COP | 208,19 за 1 000 000 | 0,00% |
INR | 0,01 | 0,00% |
NOK | 0,08 | 0,00% |
BRL | 0,16 | 0,00% |
BTC | 63 809,37 | –0,05% |
ETH | 2 288,15 | –0,97% |
DOGE | 0,14 | –0,66% |
Курсы валют в EUR на 2.11.2024
Оставить ответ
Смотреть комментарии