Before pouring the mixture, the soil must be checked for the quality and possibility of endurance. In accordance with all the parameters using a metal welded grid, the future concrete highway is reinforced.
Before pouring the mixture, the soil must be checked for the quality and possibility of endurance. In accordance with all the parameters using a metal welded grid, the future concrete highway is reinforced.
Валюты | Ставка | Изменение % |
---|---|---|
USD | 0,96 | 0,00% |
GBP | 1,20 | 0,00% |
CNY | 0,13 | 0,00% |
JPY | 6,13 за 1 000 | 0,00% |
THB | 0,03 | –0,24% |
CAD | 0,67 | +0,12% |
GBP | 1,20 | 0,00% |
KRW | 662,86 за 1 000 000 | 0,00% |
SGD | 0,71 | 0,00% |
COP | 219,92 за 1 000 000 | 0,00% |
INR | 0,01 | 0,00% |
NOK | 0,08 | 0,00% |
BRL | 0,16 | 0,00% |
BTC | 93 042,15 | –0,06% |
ETH | 3 239,62 | +1,46% |
DOGE | 0,31 | –0,28% |
Курсы валют в EUR на 22.12.2024
Оставить ответ
Смотреть комментарии