Often mistakes are made at the initial stage of construction. Some of them can be corrected in the future, and some are not subject to correction or require huge material costs.
Often mistakes are made at the initial stage of construction. Some of them can be corrected in the future, and some are not subject to correction or require huge material costs.
Валюты | Ставка | Изменение % |
---|---|---|
USD | 0,95 | 0,00% |
GBP | 1,20 | –0,01% |
CNY | 0,13 | +0,02% |
JPY | 6,19 за 1 000 | +0,12% |
THB | 0,03 | –0,04% |
CAD | 0,68 | +0,03% |
GBP | 1,20 | –0,01% |
KRW | 681,35 за 1 000 000 | –0,04% |
SGD | 0,71 | –0,03% |
COP | 216,53 за 1 000 000 | 0,00% |
INR | 0,01 | 0,00% |
NOK | 0,09 | +0,01% |
BRL | 0,16 | 0,00% |
BTC | 93 670,25 | –0,34% |
ETH | 3 172,19 | –1,54% |
DOGE | 0,37 | –0,31% |
Курсы валют в EUR на 22.11.2024
Оставить ответ
Смотреть комментарии