Level with

The next action is the setting fasteners at the same level with the ceiling, output through the opening of the conductors, connecting devices. Before installing the latter, a thermal insulation ring is put on their case. Now it remains only to adjust the lamps and screw into each of them along the lamp. After that, you can proceed to checking the work.