2. Preparation of walls. In order for the wallpaper to lie down evenly and without the bubbles of the wall you need to primed, plunged and leveled. Wait for a complete drying of the soil.
2. Preparation of walls. In order for the wallpaper to lie down evenly and without the bubbles of the wall you need to primed, plunged and leveled. Wait for a complete drying of the soil.
Валюты | Ставка | Изменение % |
---|---|---|
USD | 0,92 | 0,00% |
GBP | 1,19 | 0,00% |
CNY | 0,13 | 0,00% |
JPY | 6,01 за 1 000 | 0,00% |
THB | 0,03 | 0,00% |
CAD | 0,66 | 0,00% |
GBP | 1,19 | 0,00% |
KRW | 666,45 за 1 000 000 | 0,00% |
SGD | 0,69 | 0,00% |
COP | 208,19 за 1 000 000 | 0,00% |
INR | 0,01 | 0,00% |
NOK | 0,08 | 0,00% |
BRL | 0,16 | 0,00% |
BTC | 63 785,27 | –0,09% |
ETH | 2 280,10 | –1,33% |
DOGE | 0,14 | –0,96% |
Курсы валют в EUR на 2.11.2024
Оставить ответ
Смотреть комментарии