Stages of installing a bath
2. After leveling the floor, laying tiles or other finishing work to wait to complete the walls and floor. 3. Install water distribution networks. If the plastic pipe is laid in the strobes, then all the work must be carried out before the wall cladding. 4. Determine and check the sewer. DIY bath recommendations 1. Remove transportation material from the bath, carefully put it into the room, put it upside down for convenient assembly work. 2. Install the supporting brackets, handles (if they are included), sewer siphon and overflow. During the assembly, it is advisable to open all the rubber seals with a sealant, the excess of which is then removed by a rag.