Preparation
Like any other construction enterprise, work in our case begins with the drawing. According to the document, the facade should be covered with a horizontal crate, which is assembled using torn boards, bars, metal profiles. If the building is built of wood, the need for a crate disappears. Heades, drain pipes, lattices and other elements are removed from the facade. After the installation of siding, they will be installed in their places.