FIRST YOUNED To CALCULETE What DEPTH in A PARTICULAR CASE SHOULD HAVE A VZD. The Main Sources of Water for Him is an Industrial Well. Designing What Will Be Located is a Very Responsight Event.
FIRST YOUNED To CALCULETE What DEPTH in A PARTICULAR CASE SHOULD HAVE A VZD. The Main Sources of Water for Him is an Industrial Well. Designing What Will Be Located is a Very Responsight Event.
Валюты | Ставка | Изменение % |
---|---|---|
![]() | 0,88 | –0,59% |
![]() | 1,17 | –0,23% |
![]() | 0,12 | –0,59% |
![]() | 6,18 за 1 000 | +0,23% |
![]() | 0,03 | +0,21% |
![]() | 0,63 | –0,53% |
![]() | 1,17 | –0,23% |
![]() | 616,73 за 1 000 000 | +0,01% |
![]() | 0,67 | –0,23% |
![]() | 204,24 за 1 000 000 | +0,44% |
![]() | 0,01 | –0,76% |
![]() | 0,08 | 0,00% |
![]() | 0,15 | +0,03% |
![]() | 82 246,16 | +0,46% |
![]() | 1 591,76 | +3,26% |
![]() | 0,16 | +2,95% |
Курсы валют в EUR на 23.04.2025
Оставить ответ
Смотреть комментарии