AFTER Falling OFF, The Removed Sides are Laid on the Drive Roller and Move to the 3RD POSITION. The Finished Product with A Bridge Crane IS Removed from the Form-Wagon and Laid on the Trolley For Delivery To the Finished Warehouse.
AFTER Falling OFF, The Removed Sides are Laid on the Drive Roller and Move to the 3RD POSITION. The Finished Product with A Bridge Crane IS Removed from the Form-Wagon and Laid on the Trolley For Delivery To the Finished Warehouse.
Валюты | Ставка | Изменение % |
---|---|---|
USD | 0,96 | 0,00% |
GBP | 1,20 | +0,02% |
CNY | 0,13 | 0,00% |
JPY | 6,20 за 1 000 | 0,00% |
THB | 0,03 | 0,00% |
CAD | 0,68 | –0,35% |
GBP | 1,20 | +0,02% |
KRW | 683,41 за 1 000 000 | 0,00% |
SGD | 0,71 | 0,00% |
COP | 218,66 за 1 000 000 | 0,00% |
INR | 0,01 | 0,00% |
NOK | 0,09 | 0,00% |
BRL | 0,17 | 0,00% |
BTC | 94 870,47 | +0,09% |
ETH | 3 213,91 | +1,09% |
DOGE | 0,45 | +11,74% |
Курсы валют в EUR на 23.11.2024
Оставить ответ
Смотреть комментарии