The Concrete Mixture Is Supplied to the Concrete Compound Bunker with A Surveying Trolley Moving Along The Overpass, a Vibration Show Suspended to the Cranes of the Carrier, Or Directly from the Concrete Node. To profect the Place of Laying the Concrete Mixture from Atmosphereic Influences Over the Concrete Pod, A Light Tent Is Arranged.
Оставить ответ
Смотреть комментарии