Stages of insulation of a house from a bar
In order for the insulation of the house from the beam to be performed at a high level, it is necessary to adhere to several stages. First of all, it is important to vertically fill the crate on the outer wall with a thickness of 40-50mm. A vapor barrier membrane is attached to the boards, which will prevent the passage of water through the thickness of the beam. After this stage, it is necessary to fill the boards again at the previous one at a distance that is suitable for your insulation material. We attach the insulation between the bars and fasten the membrane that will protect from the wind. The final stage is the mounting of the cladding.