The Next Step Is to Replace the Pipes. BUT THIS IS Done Only in Case of Emergency, IF YOU ARE NOT Going to Change the Pipes, The Start Finishing Work. In the Bathroom, it is to uce cramic tiles as finshing matiner, We Cover The Walls and Floor.
The Next Step Is to Replace the Pipes. BUT THIS IS Done Only in Case of Emergency, IF YOU ARE NOT Going to Change the Pipes, The Start Finishing Work. In the Bathroom, it is to uce cramic tiles as finshing matiner, We Cover The Walls and Floor.
Валюты | Ставка | Изменение % |
---|---|---|
USD | 0,96 | +0,10% |
GBP | 1,21 | +0,09% |
CNY | 0,13 | +0,10% |
JPY | 6,13 за 1 000 | +0,09% |
THB | 0,03 | –0,27% |
CAD | 0,67 | +0,19% |
GBP | 1,21 | +0,09% |
KRW | 663,51 за 1 000 000 | +0,10% |
SGD | 0,71 | +0,13% |
COP | 219,85 за 1 000 000 | –0,03% |
INR | 0,01 | +0,10% |
NOK | 0,08 | +0,03% |
BRL | 0,16 | +0,10% |
BTC | 92 023,98 | –1,17% |
ETH | 3 174,49 | –0,56% |
DOGE | 0,30 | –1,36% |
Курсы валют в EUR на 22.12.2024
Оставить ответ
Смотреть комментарии