In an

It is also worth starting and from whether you install the bath in an empty room, or with an existing place for washing. In the second case, the dismantling is preliminarily carried out. To do this, the water supply to the bathroom is overlapped, the drain system and the mixer are dismantled. Only after that is the dismantling of the main accessory, gently putting forward it from the previous place.