Is Attached to

PLACE The Insulation and Fix The Crate Between The Gratings, Install Another Crater From The Same Type of Material On Top of the Insulation as the First Certe. The Second Structure is Attached to the Block House from the Bottom Up, USing SPECIAL MUUNTS THAT ARE IMPLEMENTED in the BULDING MATERIALS Store.

30