Depending on the construction of the building, its construction can occupy from 3 weeks to a month or two (rarely-more). In addition, the time will be needed for the arrangement:
Depending on the construction of the building, its construction can occupy from 3 weeks to a month or two (rarely-more). In addition, the time will be needed for the arrangement:
Валюты | Ставка | Изменение % |
---|---|---|
USD | 0,95 | +0,54% |
GBP | 1,20 | +0,13% |
CNY | 0,13 | +0,66% |
JPY | 6,17 за 1 000 | +1,05% |
THB | 0,03 | –0,24% |
CAD | 0,68 | +0,66% |
GBP | 1,20 | +0,13% |
KRW | 680,96 за 1 000 000 | +0,36% |
SGD | 0,71 | +0,33% |
COP | 216,54 за 1 000 000 | +0,55% |
INR | 0,01 | +0,40% |
NOK | 0,09 | +0,56% |
BRL | 0,16 | –0,15% |
BTC | 93 840,27 | +4,73% |
ETH | 3 226,62 | +9,56% |
DOGE | 0,37 | +2,21% |
Курсы валют в EUR на 21.11.2024
Оставить ответ
Смотреть комментарии